Question: 

Is it possible to construct an assembly for ceiling between first and second floors using 2x with few layers of gypsum to obtain a 3-hour fire rating?

Question: 

The truss industry maintains that the design of truss roof and floor system permanent bracing is the responsibility of the building designer. System permanent bracing covers the entire structure and all bracing element interactions.

Question: 

We recently received bids on a school project, which referenced UL P523. This assembly used light-gauge steel trusses. We noted on the drawing that we could accept an alternate design using wood trusses in lieu of light-gauge steel framing, if the alternate design could meet the fire ratings.

Question: 

We are having a house built and on a recent visit we brought along a friend who builds houses for a living. He noticed that the trusses were wet and a bit moldy. The wood seemed warped, brown, and had white splotches on it. We are worried that it would later make the roof uneven. How could we tell how long the trusses have been exposed to the elements? What options do we have from here? Do we request new trusses, or can these be repaired?

Question: 

I am a building inspector and I have a question on information provided on truss design drawings. What does the uplift reaction number represent? Some manufacturers are very specific and state “to provide for mechanical connection of the truss to the top plate with a connector capable of withstanding a specific load.” Others simply list the uplift reaction with no further information. These are the ones that have caused a debate as to what the number actually represents.

Question: 

Can you explain drag loads and how to calculate a drag load pertaining to roof trusses?

Question: 

I am remodeling a 16-year-old ranch style home. The roof consists of 4/12 26 ft. span trusses, 24 in. O.C., over 2x4 stud walls. What is the recommended means of affixing the top plate of new interior partitions to provide the lateral support needed for the partition? Also, I want to hang a soffit above and overhanging the new kitchen cabinets (recessed lighting placed within). What is the recommended means of attaching the soffit to the underside of the trusses so as not to interfere with the designed movement of the trusses under the variable live load experienced (snow load)?

Question: 

Does the NFPA sprinkler standard address sprinkler loading? If so, how and where do I buy it? What other information do you have on sprinkler loading? How do other truss companies price jobs for sprinkler loading the plans do not include a sprinkler layout or even say what size/type of sprinkler system will be used?

Question: 

We have a customer that bought trusses in June. The trusses were shipped [ and one month later are] being set. The chords have weathered and bowed. What is the industry standard for dealing with this problem? What is our liability in this situation? We were not aware of any delays on the customer’s part and shipped as requested. Note: These trusses are 62 ft. scissor trusses.

Question: 

I installed roof trusses in my house and dry walled the ceiling to the bottom of the trusses. Now I seem to have a problem with the change of the seasons. Where the ceiling meets the interior wall, a gap opens and closes – in winter it opens, in summer it closes. What did I do wrong, how can I correct it and how should the drywall be installed in the first place?