Question: 

I have a four-year-old house with glued open-web trusses. Both the truss manufacturer and the builder have admitted to me that the trusses were installed wrong. I have a problem with the suggested repair. I have hired a structural engineer and he suggested installing a 2x10 between each truss and removing the old truss. This would have to take place on both the first and second floors because all the trusses were installed wrong. The manufacturers want to install six strongbacks on each floor, hoping this will tighten them up.

Question: 

I need to obtain some information on fire-retardant-treated roof trusses.

Question: 

I am planning a 36 ft. x 60 ft. clear-span horse barn with posts set 12 ft. O.C. If I use 2x6 verses 2x4 wood trusses what would the proper spacing be? The roofing is 29 ga. K-panels metal with insulation, and winter snowfall is minimal in our area.

Question: 

Are there any associations that have recommendations for the installation of wood trusses?

Question: 

Is it the responsibility of the truss manufacturer to provide a sealed layout drawing for roof trusses?

Question: 

As an engineer, I have noticed truss designers in some high wind states routinely using “Main Wind-Force Resisting Systems” wind pressure coefficients as opposed to “Components and Cladding” coefficients to design for wind uplift. A roof truss is not a main wind-force resisting system and would have to have a tributary area of more than 1000 sq. ft. before qualifying for the lower Primary Frame coefficients. In my experience this practice is routine.

Question: 

I have been told that the high temperatures and low humidity present in attics can cause deterioration of wood, leading to truss failure. Is this true? If so, what length of time are we looking at and can we see the deterioration in the wood by visual inspection?

Question: 

It is critical that permanent top chord bracing is supplied by proper nailing of the valley truss bottom chords to the carrying truss top chords, through purlins or properly installed rated roof sheathing. If the sheathing is not carried through under the valley framing, then the permanent top chord bracing must be supplied in another manner.

Question: 

We have a local builder wishing to use floor trusses with a 2-hour assembly. I have shown him the 2-hour design on pages 17-27 of the second edition of SBCA’s Metal Plate Connected Wood Truss Handbook. Is this assembly UL approved? If so, what is the design number?

Question: 

How long does it take the moisture content to stabilize in a wood truss? I live in southern California. Also, how much deflection should be expected in a scissors truss over a partition wall?