Design Documents

Question: 

I am a building inspector and I have a question on information provided on truss design drawings. What does the uplift reaction number represent? Some manufacturers are very specific and state “to provide for mechanical connection of the truss to the top plate with a connector capable of withstanding a specific load.” Others simply list the uplift reaction with no further information. These are the ones that have caused a debate as to what the number actually represents.

Question: 

I am looking for a 1-hour roof/ceiling assembly for wood truss construction. I would like to apply the drywall directly to the bottom of the truss and also have insulation for sound control. Is this possible without using channels and what UL number would I use?

Question: 

I need to obtain some information on fire-retardant-treated roof trusses.

Question: 

Are wood trusses designed to be fall protection anchors that would support a worker should he fall?

Question: 

How much OSB can be stacked on a floor deck without damaging the trusses?

Question: 

Is there a detailed table for gable studs that gives the maximum length a vertical member can be before a lateral brace is required?

Question: 

Can a roof truss penetrate a one-hr. tenant separation wall without having a one-hr. rated ceiling? The building official insists that the 2x4 chords are combustible and nullify the integrity of the one-hr. rated partition that is constructed in an attic above an 8 in. C.M.U. bearing wall. The partition consists of gypsum board attached to 2 x 4 stud framing. The building official insists that a ledger must be attached through the gypsum board to support the trusses each side of the wall. This is almost saying that any rated assembly must have bearing only on other rated assemblies.

Question: 

We are currently developing a project which specifies “Seismic Design Category C.” We are an East Coast truss manufacturer and have not encountered seismic requirements before.

Question: 

I am reviewing a truss package that includes multi-ply trusses. Where do I find the requirements for the attachment of the individual trusses to each other (nails and/or bolts)? Is this a requirement that the structural engineer of record needs to supply or is it the responsibility of the truss manufacturer to design?

Question: 

The truss industry maintains that the design of truss roof and floor system permanent bracing is the responsibility of the building designer. System permanent bracing covers the entire structure and all bracing element interactions.