Lumber

Question: 

The grading rules usually permit some percentage of visually graded lumber to be below grade – I believe it is 5%. ANSI/TPI 1 requires that all lumber used in trusses be of the grade specified by the truss design. A strict interpretation of ANSI/TPI 1 would require that the fabricator cull the 5% that is off grade. What are your thoughts on this?

Question: 

We are having a house built and on a recent visit we brought along a friend who builds houses for a living. He noticed that the trusses were wet and a bit moldy. The wood seemed warped, brown, and had white splotches on it. We are worried that it would later make the roof uneven. How could we tell how long the trusses have been exposed to the elements? What options do we have from here? Do we request new trusses, or can these be repaired?

Question: 

How long does it take the moisture content to stabilize in a wood truss? I live in southern California. Also, how much deflection should be expected in a scissors truss over a partition wall?

Question: 

I am trying to develop a guideline for my firefighters regarding initial fire attack in buildings with light-weight trusses. My concern is truss failure, especially when exposed to fire. Is there any information on failure time related to flame impingement? Any information about truss failure – especially in a fire condition would be helpful.

Question: 

A question has come up concerning sloped roof trusses and fire assembly ratings. Some are reluctant to rely on test results from flat (parallel chord) trusses applied to sloped roof trusses. Do you have any information regarding the suitability of the fire rated ceiling assemblies for sloped roof trusses? Does the “minimum depth” requirement of the parallel chord assembly apply to the minimum depth of a sloped roof truss (i.e., heel height?)

Question: 

I have a 29 x 72 mobile office with a 2-foot deep wooden truss above the ceiling that a client is required to sprinkler. Is there any way to avoid sprinklering above the gypboard ceiling?

Question: 

I am looking for a 1-hour roof/ceiling assembly for wood truss construction. I would like to apply the drywall directly to the bottom of the truss and also have insulation for sound control. Is this possible without using channels and what UL number would I use?

Question: 

Can a roof truss penetrate a one-hr. tenant separation wall without having a one-hr. rated ceiling? The building official insists that the 2x4 chords are combustible and nullify the integrity of the one-hr. rated partition that is constructed in an attic above an 8 in. C.M.U. bearing wall. The partition consists of gypsum board attached to 2 x 4 stud framing. The building official insists that a ledger must be attached through the gypsum board to support the trusses each side of the wall. This is almost saying that any rated assembly must have bearing only on other rated assemblies.

Question: 

Does the NFPA sprinkler standard address sprinkler loading? If so, how and where do I buy it? What other information do you have on sprinkler loading? How do other truss companies price jobs for sprinkler loading the plans do not include a sprinkler layout or even say what size/type of sprinkler system will be used?

Question: 

I have recently heard of a problem with fire-retardant-treated wood (FRTW) trusses that were manufactured and installed in 1965-1980. I was searching for more information, since my job involves the protection of property in our member school districts. I had heard that the trusses make of FRTW during that time period can or will become corrosive to the hardware and the trusses will fail.