How CMs Can Achieve Maximum Production Efficiency

Originally published by: SBCANovember 2, 2015

The following article was produced and published by the source linked to above, who is solely responsible for its content. SBC Magazine is publishing this story to raise awareness of information publicly available online and does not verify the accuracy of the author’s claims. As a consequence, SBC cannot vouch for the validity of any facts, claims or opinions made in the article.

This most highly-attended presentation at BCMC in October is now being offered as part of the SBCA Workshop Series.

If you missed it in Milwaukee, here’s your chance to hear Greg Griggs with Builders FirstSource and BJ Louws with Louws Truss teach practical applications for achieving maximum efficiency in your plant through before-and-after case studies and hands-on methods to minimize/eliminate waste.

Workshop ScheduleThis 1¼ hour workshop will be held on Tuesday, November 10 at 11am PDT/12pm MDT/1pm CDT/2pm EDT. Truss Technician Training (TTT) recertification credit, continuing education credit (CEU) and professional development hours (PDH) are available.

Workshop CostComponent manufacturing companies that attended BCMC in Milwaukee, WI in 2015 can attend this session for FREE. SBCA component manufacturer members receive a discount and pay by location so multiple employees can participate at one cost. The member cost is $30 per location; the nonmember cost is $60 per person.

For more information, visit: http://sbcindustry.com/workshop.

Check out this extra section in each digital issue of SBC Magazine for additional news, perspective, and advertiser content. Learn more and access 2016-2017 archives here.